1. Preparation:
Inspect the equipment: Ensure that all parts of the equipment are normal, without damage or looseness.
Install the material: Install the coil to be slit on the unwinding device to ensure that the coil is flat.
Set parameters: Set the slitting width, speed, tension and other parameters according to the type of material and slitting requirements.
2. Start the equipment:
Start the unwinding device: Unfold the coil and guide it to the slitting knife group.
Start the slitting knife group: Start the slitting operation.
Start the rewinding device: Collect the slitting coils into rolls.
3. Monitor the operation:
Monitor the tension: Ensure that the tension of the material is stable during the slitting process.
Check the slitting quality: Ensure that the size of the slitting coil is accurate and the edges are neat.
Handle abnormalities: If any abnormality is found, stop the machine immediately for inspection.
4. Stop operation:
Stop the rewinding device: Stop the rewinding device first to ensure that the rewinding of the slitting coil is completed.
Stop the slitting knife group: Stop the operation of the slitting knife group.
Stop the unwinding device: Finally stop the unwinding device.
Cut off the power supply: Cut off the power supply of the equipment to ensure safety.






