1 Preparation before starting up
1. 1 Check whether the main motor and paper feeding belt are normal.
1. 2 Check whether the pneumatic instrument display is in normal working condition.
1. 3 Check whether the transmission parts are short of oil and whether there are obstacles, otherwise, add lubrication properly
oil and remove obstructions.
1. 4 Check whether the protective device is installed, and remove obstacles at the aisle and entrance.
1.5 Insert the appropriate bushings into the paper core tubes on both sides of the base paper, and drive the base paper in order
Put the original paper holder step by step, and remove the packaging film and put it in the designated position.
1. 6 Adjust the deviation and movement of the paper roll on the original paper holder.
2 Start up and run
2.1 Turn on the total pressure source, the total intake air pressure source of the equipment is 6kg/cm 2 , the set value of the air pressure gauge
It is 5.5-6 kg/cm2. (The data of each model will be different)
2. 2 Turn on the main power switch on the electrical box.
2. 3 Turn on the power switch of the operation panel of the rewinding machine, and eliminate
Abnormal.
2. 4 Turn on the power switch of the operation panel of the core winding machine, and eliminate the cause of the abnormality according to the human-machine abnormality.
2.5 Turn on the power switch of the large swing operation panel, and eliminate the abnormality according to the abnormal information of the man-machine.
common cause.
2. 6 Check whether the set value of man-machine volume is the current required production value.
2. 7 Inspection Run at a low speed of 30 m/min to check whether the product meets the company's quality requirements.
2. 8 After the product meets the company's quality requirements, adjust to the normal production speed.
Feb 16, 2023
Leave a message
Rewinder safety operating procedures
Send Inquiry





